DJ561A LOT1 – “Execution of modernization works of county road 561A (KM 0+000 – 41+474) for the project ‘Modernization of DJ561 A, Giurgița (DJ 561) – Urzica Mare – Urzicuța – Afumați – Boureni – Băilești – Balasan – Moțăței Gară – Moțăței (DN 56 intersection), section 1”

About the project

The objective of the project was to stimulate mobility in the South-West Oltenia region by increasing the accessibility of rural areas to the TEN-T road, rail and naval-port network, having a positive impact both at the level of the local communities crossed by DJ561A, as well as at the level of Dolj County and the South-West Oltenia Region.

The main physical capacities achieved were road works on a length of 39.20 km, 5 bridges, culverts, water collection and discharge works, 130 intersections with side roads, 23.71 km sidewalks, 845 property accesses, 17 bus stations, 3 parking areas, and the arrangement of a level railway crossing.

Client

UAT Dolj County

Date

14.07.2020 – 21.01.2024

Category

Infrastructure