Cozia Viaduct – Design Services (Preparation of PTh, DE, CS, AT) and execution of works for the objective: “Consolidation of the viaduct on DN7 km 200+615 over the Lake Bank at Cozia”

About the project

DN 7 Rm. Vâlcea – Sibiu crosses the right bank of Lake Cozia at km 200+615, near the locality of Cozia, on a bridge built in 1983. The objective of the project was the rehabilitation of the viaduct of 636.50 m (total length together with ramps 750 m), having a carriageway width of 8.30 m, total deck width 12.10 m, and 30 spans. Rehabilitation works were carried out on the superstructure with complete reconstruction of the reinforced concrete slab and replacement of beams on certain spans. The rehabilitation of the infrastructure included, besides classic works, the underwater jacketing of the piers.

Client

CNADNR SA through DRDP Craiova

Date

22.09.2015 – 21.06.2017

Category

Bridge infrastructure